Actions
Bug #966
closedJoining link not getting cancelled - Trainer changed
Start date:
01/19/2023
Due date:
% Done:
100%
Estimated time:
Priority Sequence:
Description
We are getting 2 or more instances of the same training on Training Ops calendar on Outlook where we see just 1 training plotted at that time on that Trainer on ITEAS.
Assumption - 1. Change in trainer does not make effect to the joining link that was generated previously as the Training was confirmed before. Changing the trainer gets a new link generated but the previous joining link does not get deleted.
2. Change in date/timings of a session post confirmation may be triggering generation of a new joining link every time.
Files
Actions